Choksi Energy & Infrastructure Pvt. Ltd. is an innovative energy & infrastructure company conceived in 2010 with just 20 people, Choksi Energy & Infrastructure Pvt. Ltd. with an engineering experience of over 40 years now strives to be a leading independent windfarm developer in India.
 
In just 1 ½ year of its inception the company has successfully executed 15 MW of windfarm in the state of Madhya Pradesh and much more are under process of being executed successfully in near future.
 
Choksi Energy & Infrastructure Pvt. Ltd. is currently active in various regions of India namely in the states of Madhya Pradesh, Rajasthan, Tamil Nadu & Gujarat.

 
Choksi Energy & Infrastructure Pvt. Ltd. wind farm design and infrastructure ensures an optimal economic balance for the investors due to professional site selection & technical quality of wind turbines and infrastructure.
 
By 2016 Choksi Energy & Infrastructure Pvt Ltd has completed around 100 MW of windfarm infrastructure across India.

Infrastructure Services

Land and Micrositing

 

Our experienced team of engineers ensure professional site selection and micrositing to optimise economic balance of the project. Also our dedicated team of legal advisors and local team assure a trouble free land procurement and availability for successful completion of the project.

Civil Engineering

 

With an experience of over 40 years we ensure that the foundation of wind turbines have the right combination of steel and concrete to easily outlive the shelf of the wind turbine using the best quality standards.

 

Electrical Engineering

 

To transmit the power generated by the turbines in the safest possible way with minimal transmission losses, highest quality standards are followed as per local electricity board guidelines. The electrical yard, consisting of transformers, isolators, CT, PT, units etc. is built with reputed EB approved suppliers to ensure optimal transmission of power.

Erection and Commissioning

 

Our highly experienced engineers and skilled manpower ensures erection and commissioning of wind turbines are carried out professionally and safely. Utmost care is taken during this activity using combination of high capacity cranes, supporting cranes and skilled manpower.

Power Evacuation

 

To connect the power generated from the windfarm to the state grid combination of VCB yard, electrical transmission line and sub station is required. Our highly experienced technically qualified engineers ensures a perfect end to end solution for the same.

Operation and Maintenance

 

To ensure optimal economics balance of the wind farm it is very much essential for the wind farm turbines to be in operation mode at optimal levels. Our well experienced team ensures their optimal level of operation of wind turbines and immediate urgency in restoration is ensured during any downtime.

Value Creation Stages

Projects Executed

Jethana Windpark

 

 

Project Information

 

Wind Turbines

 

Windfarm Capacity

: 6 MW

Make

: Global Windfarms Ltd.

Start of Construction

: Sept 2010

Model

: GWP 47 750

Commissioning

: Dec 2010

Rated Power

: 750 kw

Operating Life

: 20 years

Rotor Diameter

: 47 m

Grid Operator

MPPKVVL

Hub Height

: 65 m

Nodal Agency

: MPUVNL

  

 

 

 

Bagia Naveli Windpark

 

 

Project Information

 

Wind Turbines

 

Windfarm Capacity

: 9 MW

Make

: Global Windfarms Ltd.

Start of Construction

: Mar 2012

Model

: GWP 47 750

Commissioning

: Sept 2012

Rated Power

: 750 kw

Operating Life

: 25 years

Rotor Diameter

: 47 m

Grid Operator

MPPKVVL

Hub Height

: 65 m

Nodal Agency

: MPUVNL

  

 

 

   

Mamatkheda Windpark

 

Project Information

 

Wind Turbines

 

Windfarm Capacity

: 10.5 MW

Make

: Global Windfarms Ltd.

Start of Construction

: Sep 2015

Model

: Mingyang 1.5

Commissioning

: Mar 2016

Rated Power

: 1500 kw

Operating Life

: 25 years

Rotor Diameter

: 77/89 m

Grid Operator

MPPKVVL

Hub Height

: 75/80 m

Nodal Agency

: MPUVNL

  

 

   

Ringnod Windpark

 

Project Information

 

Wind Turbines

 

Windfarm Capacity

: 14.7 MW

Make

: Suzlon Ltd.

Start of Construction

: Aug 2015

Model

: S97 – 90

Commissioning

: Mar 2016

Rated Power

: 2100 kw

Operating Life

: 25 years

Rotor Diameter

: 97 m

Grid Operator

MPPKVVL

Hub Height

: 90 m

Nodal Agency

: MPUVNL

  

 

   

Netavli Windpark

 

Project Information

 

Wind Turbines

 

Windfarm Capacity

: 14.7 MW

Make

: Suzlon Ltd.

Start of Construction

: Aug 2015

Model

: S97 – 90

Commissioning

: Mar 2016

Rated Power

: 2100 kw

Operating Life

: 25 years

Rotor Diameter

: 97 m

Grid Operator

MPPKVVL

Hub Height

: 90 m

Nodal Agency

: MPUVNL

  

 

   